Promoter

25 Mar 2024

According to the RERA Act 2016, any person or entity that constructs or converts a building into apartments, develops land for sale, sells residential apartments or plots shall be considered the promoter of a project. If more than one entity or individual is responsible for development, both shall be held jointly liable to fulfil the functions and responsibilities as specified under the Act and the rules and regulations made there under.

Allottee

22 Mar 2024

According to Section 2 (d) of the RERA Act 2016, an “allottee” refers to an individual to whom a plot of land, apartment or building has been sold, allotted or transferred by a promoter. It includes anybody that may subsequently acquire the said allotment through a sale but does not include those renting the property.

Construction & Demolition waste (C&D)

21 Mar 2024

Construction and demolition (C&D) waste refers to waste generated from construction, renovation, repair, and demolition of houses, large building structures, roads, bridges and dams. It also includes any surplus and damaged products and material arising through the course of construction work or used temporarily during the course of on-site activities. Materials found in C&D waste can be but are not limited to wood, steel, concrete, gypsum, masonry, plaster, metal, and asphalt. C&D waste can contain hazardous materials such as asbestos and lead.

Façade

20 Mar 2024

A façade refers to the front or exteriors of a building. A facade can serve many purposes such as adding to the aesthetics of the property, establishing a theme, protecting or supporting the building structure, and conserving energy.

Completion Certificate (CC)

19 Mar 2024

A Completion Certificate (CC) is given to a project when it has been developed according to the sanctioned plans and has met all other building standards as prescribed by the local governing authority. In Maharashtra, in order to procure a CC, the builder’s architect must submit a formal letter stating that the construction has been completed according to the standards set forth in the IOD and CC. A completion certificate (CC) can be procured for a particular building (BCC) and for a project as a whole.

Occupancy Certificate (OC)

18 Mar 2024

An Occupancy Certificate (OC) is a document that certifies that a building has been constructed and developed as per the approved plans and complies with all the necessary safety norms and regulations. The certificate is issued by the local municipal authority after construction is completed, and serves as proof that the building is ready for occupancy. It is illegal to occupy a flat in a building which has not received an Occupancy Certificate.

Reinforced Cement Concrete (RCC)

15 Mar 2024

Reinforced Cement Concrete (RCC) is a composite building material that consists of structural concrete and a reinforcing material such as steel. The tensile strength of steel and the compressive strength of concrete work together to sustain stresses over considerable spans. The reinforcing steel can be in the form of rods, bars, or mesh. The invention of reinforced concrete in the 19th century revolutionized the construction industry, and concrete became one of the world’s most common building materials.

Plain Cement Concrete (PCC)

14 Mar 2024

Plain Cement Concrete (PCC) in construction refers to a type of concrete that consists of cement, fine aggregates (such as sand), coarse aggregates (such as gravel or crushed stone), and water. PCC is a simple and commonly used form of concrete that does not contain any reinforcing materials like steel bars. It is primarily used for non-structural components or applications where structural strength is not a critical factor.

RERA Carpet Area

13 Mar 2024

The carpet area of a flat refers to the actual useable space within a property. It represents the area on which one can place a carpet. The Real Estate (Regulation and Development) Act, 2016 describes carpet area as the net useable floor area of an apartment, excluding the area covered by external walls, areas under service shafts, exclusive balcony or verandah area and open terrace area, but includes the area covered by the internal partition walls of the apartment.

Precast Concrete

12 Mar 2024

Precast concrete, also known as prefabricated concrete is an alternative to cast-in-situ concrete. It is produced at an off-site controlled factory environment where moulds are used to cast elements such as slabs, walls, columns, beams, etc which are then transported to the construction site for assembly. This method eliminates the need for time-consuming on-site casting and curing, allowing for faster project completion.